Washington Blvd. Commercial Sewer Bore - Ogden, Utah
Overnight Precision. Minimal Disruption.
When a commercial developer needed a new sewer lateral installed beneath one of Ogden's busiest roadways, open-cut excavation wasn't an practical option. The project required maintaining traffic, minimizing disruption, and completing the installation within a single overnight work window.
Using our compact pit-launched horizontal directional drilling system, Chamba Trenchless completed the entire bore in one night.
Our scope included:
Installing the pilot bore beneath Washington Blvd.
Backreaming to the required diameter
Pulling the HDPE sewer pipe into place
Delivering a properly sloped sewer lateral ready for final connection
Working overnight allowed the roadway to reopen with minimal impact to surrounding businesses and traffic while avoiding the time and cost of traditional trenching.
At Chamba, we specialize in projects where precision, speed, and minimal surface disruption matter most.
Project Highlights
✔ Commercial sewer lateral installation
✔ Pit-launched horizontal directional drilling (HDD)
✔ Completed during a single overnight closure
✔ Minimal impact to traffic and surrounding businesses
✔ Trench-free installation beneath an active roadway